Skip to main content

Posts

Showing posts with the label Buildings

Raffles City Chongqing / Safdie Architects / China

Raffles City Chongqing Architects:  Chongqing Architecture and Design Institute; Moshe Safdie & Associates; P&T Group  Location:  Chongqing, China Owner/Developer:  Capita Malls Asia; CapitaLand Limited; Singbridge  Structural Engineering:  ARUP, East China Architectural Design & Research Institute  MEP Engineer:  Parsons Brinckerhoff Consultants Private Limited Project Size:  817,000 sq.m Development GFA:  1,134,260 m 2 / 12,209,073 ft 2    Building Height:  354.5 m / 79 story Building Function:  Residential, Office & Mixed-Use Structural Material:  Composite (Core-Reinforced Concrete; Columns-Concrete Encased Steel; Floor Spanning-Steel) Project Dates:  2011 - 2019 Facade Engineer:  ALT Limited Quantity Surveyor:  Rider Levett Bucknall   Landscape Architect:  Williams, Asselin, Ackaoui & Associates   Interior Design, Hotel &...

Pixel Building / Studio505 / Australia

Pixel Building Architects:  Studio 505 Location:  Carlton, Melbourne Victoria, Australia Client/Developer:  Grocon Pty. Ltd. Structural Engineer:  VDM Pty. Ltd. Project Completed:  2010 Estimated Cost:  AUD $ 6 Million Project Type:  Office Building Gross Internal Area:  11360.4 m 2 Contractor:  Grocon Constructors Pty. Ltd. Building Surveyor:  PLP Building Surveyor & Consultants Landscape Design:  Studio 505 and University of Melbourne Acoustic Engineer:  Marshall Day Acoustics Carbon Analysis (Pixelcrete):  RMIT University Centre for Design Fire Consultant:  Aurecon Town Planning Consultant:  Meredith Withers & Associates Pty. Ltd Grey Water and Carbon Embodied Analysis:  CSIRO Located on a key site at the former CUB Brewery, Pixel Building is one of Melbourne's most significant and ambitious developments. It sits perfectly between the popular inner-city suburb of...

Manitoba Hydro Place / KPMB / Canada

Manitoba Hydro Place Architects:  Kuwabara Payne McKenna Blumberg (KPMB) Architects (Design Architects); Architecture 49 (Executive Architects); Transsolar (Specialist Energy/Climate Engineers); Prairie Architects Inc. (Advocate Architect) Location:  Winnipeg, Manitoba, Canada  Client/Developer:  Manitoba Hydro  Architect of Record:  Smith Carter Architects & Engineers  Structural Engineer:  Croslier Kilgour & Partners Ltd.; Halcrow Yolles   MEP Engineer:  AECOM Main Contractor:  J.D. Strachan Construction Ltd.; PCL Constructions Eastern   Environmental Consultant:  Transsolar Energietechnik GmbH Wind Consultant:  RWDI Project Size:  695,250 s.f. Project Type:  Office Tower Construction Dates:  2005-2009 Energy Label:  LEED Platinum Certified Manitoba Hydro Place introduces a new paradigm to lead the AEC insudtry to a carbon-neutral future using a formal...